The Project Preparation Facility (PPF) Unit of TAIPED was designated by the Government Committee under Law 4799/2021 as responsible for the preparation and implementation of the Project ‘Upgrade of Alexandroupolis Port Infrastructure: Restoration of depths in the port basin and navigation channel – Road connection to the new Ring Road’ (OPS TA 5210173), within the framework of Action ‘Interventions for the upgrade of regional ports’ (RRF 16975), under the competence of the Ministry of Maritime Affairs and Insular Policy. The project is implemented within the framework of the National Recovery and Resilience Plan ‘Greece 2.0’, funded by the European Union – NextGenerationEU. Within the framework of the above project, the following subproject is also being implemented, concerning the award of the contract titled ‘SUPPLY AND INSTALLATION OF A NEW AUTOMATIC LEVEL CROSSING SYSTEM (ASID) SIL4 ON THE LINE SECTION ALEXANDROUPOLIS CENTRAL STATION – NEA PROVLITA, with Hellenic Railways S.A. acting as the Contracting Authority.

Leave a Reply

Your email address will not be published. Required fields are marked *

Post comment