The intention of Public Power Corporation to withdraw a total of 41 power generation units from Crete, the Cyclades and the non-interconnected islands from end-2023 up until 2028 sounded the alarm at the Ministry of Environment and Energy.
The intention of Public Power Corporation to withdraw a total of 41 power generation units from Crete, the Cyclades and the non-interconnected islands from end-2023 up until 2028 sounded the alarm at the Ministry of Environment and Energy.